“BP is focused on delivering growth with discipline, carefully choosing and efficiently executing high-quality projects. The longstanding partnerships we have in Egypt allowed us to fast-track Atoll’s development and deliver first gas only 33 months after discovery. This is a further demonstration of our commitment to help realise Egypt’s oil and gas potential and meet the increasing demand from its growing population.”
?

Bob Dudley, BP group chief executive

BP announced the Atoll discovery in March 2015. The main reservoir in the field contains an estimated 1.5 trillion cubic feet of gas and 31 million barrels of condensates, and further segments are under evaluation.

The Atoll Phase 1 project is an early production scheme involving the recompletion of an existing exploration well as a producing well, the drilling of two additional wells, the installation of the necessary subsea infrastructure, and upgrading of existing onshore facilities required to produce from the field.

福利视频 The Atoll project was delivered 33 months after discovery, with test production starting on 2 December 2017, seven months ahead of the original plan. The project will produce up to 350 million standard cubic feet a day (mmscfd) gas and 10,000 barrels per day (bpd) condensate, which will be processed at the West Harbour facilities and fed into Egypt's national grid.

Location  Egypt
Operator Pharaonic Petroleum Company (PhPC)
Partners BP (100%)
Project type Conventional gas
Peak annual average production
~65 mboed(gross)
~45 mboed (net)
Atoll Phase 1, Egypt

Atoll’s exploration well reached 6400 metres in depth in 2015. That’s drilling further than the height of Mount Kilimanjaro (5,895 metres).

Atoll Phase 1, Egypt

福利视频Atoll’s wells on the seabed connect to new and existing production facilities. That subsea tieback is BP’s longest on record at 110 kilometres, almost as far as the distance between the Egyptian cities of Cairo and Suez.

Atoll Phase 1, Egypt

福利视频The Atoll project was delivered 33 months from discovery and seven months ahead of original plan.

Gallery

Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
偷拍久久国产视频|老司机在线国产|手机看片福利永久国产 天天干-夜夜啪_天天操-天天啪-天天射-天天日-天天撸-天天福利视频 人人操_人人碰_人人碰福利视频_人人干_人人摸_人人看_福利视频97_福利视频福利视频 日本在线加勒比福利视频,福利视频,日本福利视频a不卡免费,免费无码不卡 福利视频在线_福利视频_91国产福利视频视频 国产aⅴ在线福利视频线_中国大陆高清aⅴ毛片_福利视频 无码av高清毛片在线看_日本一级特黄大片_日本毛片福利视频观看_免费v片福利视频网站 大香蕉 大福利视频 大香蕉电影 大香蕉影院 福利视频福利视频福利视频 福利视频大香蕉在线福利视频